Water Connections
31 Liebert
®
CRV
7.4 Chilled Water Connections: Chilled Water Units
Figure 20 Chilled water connections
Refer to Figure 21 when performing these installation steps:
Use copper tubing or steel pipe.
Place the tubing on supporting saddles.
Insulate both tubes
Install shutoff ball valves on the inlet and outlet pipes to ease maintenance.
Install optional thermostats and pressure gauges on the inlet and outlet pipes.
Install a water drain tap at the lowest point in the circuit.
Fill the circuit with water or glycol.
Figure 21 Chilled water circuit
Top Connections
Bottom Rear Connections
Tubing Support
Water Drain Tap
Ball
Valves
Thermostat
Pressure
Gauge
Insulation
Liebert CRV