3Com RELEASE 2 Gas Grill User Manual


 
Introduction
This manual shows you how to install and test a MERLIN
®
Plus
Communications System, Release 2. You should perform the tasks in the
order presented since many of the early tasks prepare the system for those to
be performed later.
The following is a brief overview of the installation steps in this manual:
Set up and connect the system’s control unit, beginning with the network
interface, as described in "Step 1: Installing the Control Unit."
Install the wiring for your voice terminals as described in
"Step 2: Wiring the Voice Terminals."
Connect your voice terminals to the system according to the instructions
in "Step 3: Connecting the Voice Terminals."
T
O make sure you’ve installed the system correctly, test the system using
the procedures in "Step 4: Testing the System."
Learn about some accessories you may want to add to your system in
"Step 5: Adding Accessories."
You can easily rearrange your system once it’s in place by following the
instructions in "Step 6: Changing the System."
If you are installing a jack field and building wiring, read the instructions in
the "Jack Field Wiring Supplement" at the end of this manual before installing
the MERLIN Plus system.
When you complete the steps in this manual, you will be ready to customize
the system to meet the needs of your business by following the instructions in
Section 3, "Administering the System," in the MERLIN Plus System Manual.
NOTE: Your system may not be fully operable until you program and
administer it.
For reference purposes, place this manual in the System Manual binder when
you are finished with the installation.
Figure 1 shows a typical MERLIN Plus system.
Introduction 1