Special offers from our partners!
Find Replacement BBQ Parts for 20,308 Models. Repair your BBQ today.
Buy Weber Grill Parts. It couldn't be easier. Find your Weber parts here.
17
Step 7
Tighten all frame bolts
Fully tighten the 1/4-20 bolts in the frame assembly, that
you only started in Step “Continue Frame Assembly”
Figure 12.
Figure 12
Figure 11
Typical installation of the base for an existing
concrete patio, new pad or wood deck (continued)
Method 4 - Wood deck
After assembling the base according to the assembly
instructions, position the base assembly on your deck for
anchoring.
ƽCAUTION: Combustible materials should never be
within 24 inches of the top, bottom, back or sides of
the barbecue. Do not locate under overhead
combustible construction.
ƽCAUTION: For a deck installation, it is recommended
to anchor one screw into a joist.
Note - With the lid open, the depth of the barbecue is
28 inches, front to back.
Anchor the base to the deck. We recommend using a
minimum of a 3/8 inch x 1 1/2 inch lag bolt with a 3/8 inch
flat washer. Figure 10.
Note - Use a 3/16 inch drill bit for drilling a pilot hole for a
3/8 inch lag bolt.
3/8 inch x 1 1/2 inch lag bolt
3/8 inch flat washer
Mount plate
Drilled hole
Figure 10
1
2
3
4
ƽWARNING: Whichever method used, the base must
be bolted down (anchored) at a minimum of four
anchoring points (two per side) prior to barbecue
assembly. One anchor in each corner of the base plate.
Figure 11.