Interlink electronic L485SIB Gas Grill User Manual


 
22
www.ultrachefgrills.com
4 x N570-0091 (1/4-20 X 1/2”)
3/8”(10mm)
Correct Assembly
9. Grill Head Installaon
L485RSIB MODELS - Are equipped with internal lights. To avoid assembly dicules, prior to mounng grill head
remove the zip e holding the wire connectors in place. (Take care when removing the e not to damage the wires).
En
sure the wires drop inside the cart and do not become pinched between the grill head and the cabinet when mounng
the grill head.
PROPANE ONLY - To avoid assembly dicules, prior to mounng the grill head, remove zip e holding regulator
up un
der control panel. This was installed at the factory to protect the regulator hose during shipping and is no longer
required. (Take care when removing the e not to damage the hose). Ensure the regulator drops into the small opening,
between the tank heat shield and the right side of the cabinet.
Li grill head and place on assembled cart, lining up holes in top of side cart panels with holes in boom of base. Fasten
from inside using (4) 1/4-20 x 1/2” screws, two per side.
Two people are required for this step.
Incorrect Assembly
10. Transformer / Rosserie Mount Installaon (RSIB MODEL)
Connect the two wire connectors from the lights to the two wire connectors coming from the transformer. Install rosserie
mount bracket to le side of barbecue as shown using (2) 1/4 – 20 x 3/8” screws.
Baery Pack / Rosserie Mount Installaon (RSB MODEL)
Install baery pack below vent slots on le hand panel using magnet supplied with baery pack. Plug wire from LED
(lights) located underneath control panel into wire from baery pack. Install rosserie mount bracket to le side of
barbe
cue as shown using (2) 1/4 – 20 x 3/8” screws.