CFM Corporation 7000 Gas Grill User Manual


 
11
2. Position the pillar upside down,
and set the base onto the pillar
as shown.
Working from the open side of pillar:
3. Insert four bolts through the holes
in the pillar and through the four
holes in the base. Thread nuts
onto bolts. Align rear holes and
insert bolts. Add nuts and use
wrenches to tighten.
4. Carefully turn the assembly
upright.
5. Check the preassembled control
valve located inside the pillar.
Remove the plastic film covering
the front of the control panel
plate.
Your grill will now look like this >