Special offers from our partners!
Find Replacement BBQ Parts for 20,308 Models. Repair your BBQ today.
108660-01D
7
7
For more information, visit www.desatech.com
For more information, visit www.desatech.com
PRE-INSTALLATION PREPARATION
Framing
PRE-INSTALLATION
PREPARATION
Continued
FRAMING
1. Frame appliance enclosure as illustrated in Figures 7 and 8.
Note:
If a wall covering is used to line the enclosure, then all
measurements must be from the surface of the covering.
2. Place the appliance into the framing and secure it.
Note:
If appliance is to be raised above floor level, a platform
must be built to support the appliance.
3. Install the supply line to the appliance using a 1/2" NPT black
iron gas line terminating 2
5
/16" above the bottom of the appli-
ance. The gas line may be installed from either side or from
the rear of the appliance (see Figure 19, page 11).
4. Feed flexible gas line through one of three gas line conduit
sleeve and repack insulation to cover any openings. Prepare
the incoming gas line with teflon tape or pipe joint compound
and hook-up incoming gas line to the flexible gas line.
Note:
If 1/2" NPT black iron pipe does not mate with fitting at
the end of flexible gas line, remove fitting and replace with a
37 degree flare 3/4"-12, 1/2" NPT (female) fitting.
Figure 7 - Rough Opening for Installing in Wall
16
1
/
8
"
34
3
/
4
"
36
5
/
8
"
Figure 8 - Corner Installation Guidelines
16
3
/
4
"
12"
39
3
/
8
"
55
5
/
8
"
34
1
/
2
"
16"
These Dimensions Allow for a
3/4" Clearance at Sides and
Back of Fireplace. However, 0"
Clearance is Permitted
3/4" Clearance
Not Required
at Nailing
Flanges
WARNING: When finishing appliance, do not overlap
combustible material onto the black front face. Brick, tile,
or other noncombustible materials may be applied to the
face provided that any gap is between the material used
and the face is caulked with a noncombustible caulking.