Black Box Cold Front Outdoor Kitchen Island User Manual


 
724-746-5500 | blackbox.com
About Black Box
Black Box provides an extensive range of networking and infrastructure products. You’ll find everything from cabinets and racks
and power and surge protection products to media converters and Ethernet switches all supported by free, live 24/7 Tech support
available in 30 seconds or less.
© Copyright 2011. Black Box Corporation. All rights reserved. Black Box
®
and the Double Diamond logo are registered trademarks, and Cold Front
is a
trademark, of BB Technologies, Inc. Schrader
®
is a registered trademark of Schrader-Bridgeport International, Inc. UL
®
is a registered trademark of Underwriters
Laboratories. Any other third-party trademarks appearing in this manual are acknowledged to be the property of their respective owners.
CFD42UBF24 Planning Guide, version 1
BL A C K BOX
®
3. Treated water is pre-mixed in the factory without the need to further dilute or enhance it in the field prior to initially filling the
system.
4. Treated water is supplied in containers suitable for easy transportation.
5. Containers are either 5 U.S. gallons or 55 U.S. gallons.
2.2.3 Air Purge Tool
1. Tool consists of two (2) unequal lengths of ¼" refrigerant hose with maximum working pressure of 5.5 MPa (800 psi) and
burst pressure rating of 27.6 MPa (4000 psi).
2. Hoses are 6" (15.2 cm) and 72" (182.9 cm) in length.
3. Hoses are UL
®
Recognized.
4. One (1) air purge tool is supplied per project site.
3. Service
3.1 General
3.1.1 Installation
1. Install the HTD in accordance with the installation instructions in the user’s manual.
2. Maintain recommended service clearances as outlined in the installation instructions.
3. Installation services will be provided by factory authorized personnel.
4. Each enclosure using an HTD will have all openings blocked wherever possible to ensure that exhaust air is directed through the
HTD. Open U spaces on the front mounting rails should have blanking panels attached. Any cable access holes or other open-
ings in the enclosure roof, base, or side should be blocked off to avoid any leakage of exhaust air.
3.1.2 Startup and Commissioning
1. Start up the unit in accordance with the manufacturer’s startup instructions.
2. Commissioning services will be provided by factory-authorized personnel.